None of the offers in “Automated storage and retrieval systems (AS/RS)” fit?
Review the available offers and, if none fits, describe your requirements. Verified companies may respond after confirmation and moderation.
2 short steps. Clicking the button does not publish anything.
Ask for an offer in “Automated storage and retrieval systems (AS/RS)”Describe your requirements in a separate request. Verified companies may respond after email confirmation and moderation.
Describe what you need
Confirm your email to complete your request
Your request is saved, but companies cannot see it yet.
Open the message from Motendo and click the request confirmation button.
After confirmation, we will review the content before publishing it.
Cannot find the message? Check Spam or Promotions.
Per page
How should Automated storage and retrieval systems (AS/RS) listings be compared?
AS/RS is an automated storage and retrieval system, not a single rack or conveyor. Cranes, shuttles, lifts, conveyors, racking, controls and software must form a supported system that can be recommissioned.
What actually changes the choice?
Unit load: pallet, tote or tray, dimensional tolerance, mass and base quality; capacity: locations, depth, zones and storage strategy; flow: average and peak inputs/outputs, sequence and buffers; building: height, floor, structure, temperature, fire strategy and service access; control: PLCs, drives, WCS, WMS/ERP, diagnostics, redundancy and code ownership
Comparison becomes meaningful only after the load unit, flow profile and interfaces are defined. The rated throughput of one module is not the throughput of the complete installation.
How should a used item be checked?
For a used AS/RS inventory equipment, cabinets, drives, sensors and networks by serial. Inspect wheels, rails, ropes or belts, telescopic forks, guides and power collectors. Run representative inbound, storage, retrieval and fault-recovery cycles. Verify program backups, credentials, licences, machine-safety files, obsolete parts and whether geometry can be recreated after dismantling.
What information should the seller provide?
Provide the load-unit and flow profile, required availability, building and host system. Request layout, equipment list, diagrams, PLC/WCS code and backups, versions, licences, interfaces, cycle times with assumptions, fault history, critical spares, dismantling/reinstallation plan, commissioning scope and acceptance tests.